(1) Installation :
1. Clean up the instrument, drill a hole in the wall, and connect the water pipes to prevent water flow.
2. Power : (1) 220V, 50V, 50Hz are fitted with three single-state copper lamps and are equipped with a 50A electrical switch.
(2) 380 V, 50 Hz is equipped with a 4 mm . lamp and a 30 A short circuit breaker using three radio transmitters.
(2) Performance Test :
Performance Test of pulping System
1. Loosen the screws on the mixer, replace it with a mixer, unplug the mixer, and then open the lid.
2. Turn the net using the finger, then turn the motor around, close the lid, adjust the thickness of the locked shelf, and roll it around to turn the turning axis.
3. Turn on the power switch, turn on the power switch, and turn on the timer to remove fine dust, remove fine dust, and then slowly remove fine dust.
Use a pool to verify the performance of a system
1. Check the boiler installation status, make sure that all water and electricity are ready, and when you see water boiling in the tap, the level of water rises higher.
Taking a close look at the boiler's level is strictly controlling water shortages inside the boiler.
A trial run test of a facility
If the assembly is in working order and the inspection is not complete, then all preparation is complete and the process is detailed. Here you will be able to explain in detail how and how it works. |